Call for Expressions of Interest: Expanding Maintenance and Calibration Services for California’s State Prison Water Treatment System.

Quotes Needed for Water Treatment Technology Services by CDCR

Interested vendors are invited to submit maintenance, calibration, inspection, and repair services for the Supervisory Control and Data Acquisition (SCADA) system at the California State Prison, Solano water treatment plant. The performance period for this agreement is from July 1, 2024, to June 30, 2027, with an initial agreement not exceeding $180,000 as stated in the RFQ documents.

The solicitation was released on March 21 and requires vendors to participate in a mandatory walk-through of the facility before submitting a quote package. Walk-throughs must be scheduled through Martha Gallegos and Billy Ray Butler before April 5. The deadline to submit a bid package is 2 p.m. on May 7. Ashley Koewler is the point of contact for this RFQ.

If deemed in the best interest of the CDCR, the resulting agreement may be amended to extend the term and/or increase funding consistent with the original Scope of Services according to the documents. Vendors should ensure they complete their walk-throughs and submit their bid packages on time to be considered for this opportunity.

Leave a Reply